skip to Main Content

Dry Milling Airflow

Our client wanted an evaluation of airflow at five of their pet care production facilities. The evaluations included equipment audits and airflow analysis on pneumatic lift hammermill systems and plenum hammermill systems. The evaluation we needed to determine if the…

Read more

Corn Syrup Demineralizer

This project modified an existing building to accommodate demineralizer vessels that were relocated from another facility. The design included multiple elements; Building Modifications, which included foundations for the vessels and structural modifications to make the building suitable for the vessels…

Read more

Baking Line Upgrade

The client contacted ADF when they needed to help a sister facility’s demand requirements. The project included the redesign of a baking equipment production line to output a new flavor additive into an existing chocolate cookie coating, alternating outputs between…

Read more

Boiler Design and Installation

Our client requested ADF’s services to design and implement a new 100,000 pound per hour natural gas-fired boiler into their existing steam and condensate process. The equipment was located in a new pre-engineered metal building at their lysine production facility,…

Read more