Food Facility Packaging Line Expansion

CLIENT: Global Aseptic Food Manufacturer PROJECT:  Packaging Line Expansion BACKGROUND: The site wanted to expand with 2 new packaging lines but was concerned about the existing utilities capacities. ADF was asked to perform studies to evaluate each utility to determine…

Read More

Extraction Facility Energy Savings

CLIENT: Multinational Oilseeds Manufacturer PROJECT:  Flash Steam Recovery and Wastewater Evaporator Preheat BACKGROUND: A site had previously performed a high-level energy audit to identify potential energy savings projects. ADF Engineering was brought in to evaluate the projects and determine which…

Read More

Oilseed Extraction Area Expansion

CLIENT: Multinational Oilseed Processor PROJECT: Existing Plant Extraction Expansion including new Desolventizer Toaster & Dryer Cooler (DT and DC) BACKGROUND: After a qualification based selection process involving several leading engineering companies, the client selected ADF Engineering to upgrade and increase…

Read More

Feed Plant Modernization

Feed Plant Modernization

CLIENT: Multinational Animal Feed and Nutrition Supplier PROJECT:  $50MM Existing Plant Renovation including new Automated Weighing & Dosing System addition BACKGROUND:  After a qualification-based selection process involving several leading engineering companies, the client selected ADF Engineering to convert a newly…

Read More

Oil Blending Facility Design

Our industrial baking oil blender client wanted to build a new state-of-the-art oil blending operation that had the flexibility to blend standard, non-GMO, and organic oils for their six business units serving their clients in the baking industry. WORK COMPLETED:…

Read More

Mechanical and Piping Contractor Pipe Stress Analysis

This Midwestern contractor required assistance with determining the thermal stress and displacement for multiple steam and steam-in-place (SIP) process piping at a new facility that was being built. For this project, ADF performed pipe-stress and displacement analyses using the latest…

Read More

Chemical Company Debottlenecking

A chemical company working with cyclodextrin, toluene, and decane needed to increase yearly production by 10% in the first year of operation and maintain an additional 20% after to meet growing customer demand. WORK COMPLETED: The project was completed in…

Read More

Secondary Containment Evaluation

A chemical company working with Lysine wanted to develop an overall facility site map drawing to show secondary containment volumes for each process area. The updated documentation will be referenced for future expansions and internal/external environmental audits. The secondary containment areas…

Read More