skip to Main Content

Food Facility Packaging Line Expansion

CLIENT: Global Aseptic Food Manufacturer PROJECT:  Packaging Line Expansion BACKGROUND: The site wanted to expand with 2 new packaging lines but was concerned about the existing utilities capacities. ADF was asked to perform studies to evaluate each utility to determine…

Read More

Oilseed Extraction Area Expansion

CLIENT: Multinational Oilseed Processor PROJECT: Existing Plant Extraction Expansion including new Desolventizer Toaster & Dryer Cooler (DT and DC) BACKGROUND: After a qualification based selection process involving several leading engineering companies, the client selected ADF Engineering to upgrade and increase…

Read More

Oil Blending Facility Design

Our industrial baking oil blender client wanted to build a new state-of-the-art oil blending operation that had the flexibility to blend standard, non-GMO, and organic oils for their six business units serving their clients in the baking industry. WORK COMPLETED:…

Read More

Secondary Containment Evaluation

A chemical company working with Lysine wanted to develop an overall facility site map drawing to show secondary containment volumes for each process area. The updated documentation will be referenced for future expansions and internal/external environmental audits. The secondary containment areas…

Read More

Pharmaceutical Manufacturer Facility Expansion

The client was operating at maximum capacity and contacted ADF Engineering to help expand their facility to provide additional capability. The finished product resulted in a high warehouse storage capacity and ancillary support facilities.   Project Summary   This project…

Read More

Boiler Design and Installation

Our client requested ADF’s services to design and implement a new 100,000 pound per hour natural gas-fired boiler into their existing steam and condensate process. The equipment was located in a new pre-engineered metal building at their lysine production facility,…

Read More

Waste Water Treatment Plant Installation

The client needed to replace their undersized waste water treatment (WWT) facility while maintaining plant production. The new WWT facility was designed to treat process water and rainwater at a combined rate of 500 gallons per minute, and then discharge…

Read More

Soy Product Loadout Facility

Our client wanted to replace their loadout system and move it to a new location within their international shipping facility. The new system needed to deliver a soy product into 40-foot sea containers at a rate of 100 tons per…

Read More