Project Experience: Sugar Transloading Facility Design and Construction



Background: The client needed to build a sugar transloading facility on a greenfield site in the Midwest to reduce their shipping and delivery times in the region. They wanted to receive sugar from bulk rail cars and store the product in a 1.3 million cwt. dome silo. The facility's sugar loadout rate will fill four trucks per hour from two loadout locations, totaling 200,000 pounds of sugar per hour.

Project Summary: This project was designed in a year-long accelerated timeframe to complete construction for the Fall 2016 sugar beet harvest, with initial design work beginning in Fall 2015. During the course of the project, ADF: