Critical Design Phases For Upgrading Oilseeds Facilities, Inform Magazine, April 2016
Critical Design Phases for Upgrading Oilseeds Facilities, Inform Magazine, April 2016
Critical Design Phases for Upgrading Oilseeds Facilities, Inform Magazine, April 2016
The client planned to launch a new product from an existing feed stock and requested process design assistance from ADF Engineering. The new product would need to incorporate ingredient additions from several processes throughout the facility. The new product would…
The client approached ADF with a request to provide engineering services to redesign piping that would replace an aging system for a caustic treatment process. The intent of the project was to improve the pipe material specifications, provide better ergonomics…
The client approached ADF with a request to provide engineering services to replace a Turn Head in the grain receiving elevator. The new Turn Head would need to incorporate two new product receiving spouts while maintaining the existing spouting and…
The client approached ADF with a request to provide a 3D model of several existing process systems along with the facility infrastructure to allow for module skid integration into an existing process. The area to be modeled included recently added…